Implemented works
Concept Development
Design
Construction of Alpine ski facilities
Construction
Geotechnical protection against natural hazards
Type of works:  design and survey work, construction and installation work
Contract type:  General design, general contract
Customer :   Gazprom sotsinvest LLC
28%
Implementation status
8/10
Level of Complexity
7/10
Scale of Project

Objectiv: To develop design and detailed documentation for the project of connecting routes between ski slopes at the Pikhtovaya Polyana site of GTC Gazprom PJSC, to perform construction and installation.

1
Connecting route № 1
2
Connecting route № 2
3
Engineering networks and systems
4
Geotechnical protection against natural hazards
5
  Artificial snow making system  

Project content

Name: Connecting routes between ski slopes at the Pikhtovaya Polyana site of GTC Gazprom PJSC

Location: Krasnodar Krai, Sochi, Adler District, village Estosadok


  1. Connecting route No. 1, length – 1107 m, area – 34,0633 м2
  2. Connecting route No. 2, length – 1128 m, area – 36,551 м2
  3. Networks and system of artificial snow of connecting routes and engineering networks and systems
  4. Engineering protection: supporting walls, anti-erosion slope protection, slope strengthening, retaining structures in landslide hazard slope sections.